How can district heating costs be reduced in an office building?
Paweł Święch, founder and technical leader, IQ-BuildingUpdated:
There are two independent ways, and both are worth using. The first is controlling the heat substation from the BMS: flow temperature on a weather curve and less unnecessary circulation. The second needs no automation at all: check whether the capacity contracted with the heat supplier matches what the building actually draws. Buildings often pay for capacity they never use.
What a heat substation contains
An office heat substation always has a domestic hot water section, with scheduled pasteurisation. The heating side may be a single section, but it is often split in two: space heating for hundreds of fan coil units and a separate circuit for air handling unit coils. That gives up to three sections. Because it is critical plant, it gets its own control cabinet with an independent PLC and a touch panel.
What BMS control adds
- Weather curve. Heating water temperature follows outdoor temperature. The curve can be edited at any time, per section.
- Less circulation. A building holds kilometres of heating pipework. Circulating water that is hotter than needed, when nobody needs heat, wastes a lot of energy.
- Coil circuit pumps on demand. Only where the coil circuit is filled with glycol: with plain water the circuit must never be switched off, because standing water in a coil can freeze in cold weather. The pumps feeding the air handling unit heating coils start when the heating valve of any running unit opens above a start threshold (for example 60%) and stop when all valves stay below a stop threshold (for example 30%) for a few minutes, or when the last unit stops. The maintenance team sets both thresholds on screen, and the controller states its current decision in full sentences.
- Visibility. Valve and pump status, temperatures and pressures on both the network and building sides, each with a trend, plus manual control when needed.
Contracted capacity: a cost automation cannot cut
A district heating bill is not only the energy used. A fixed part is the charge for contracted capacity, paid however much heat the building takes. That capacity is often set at design stage with a wide margin and never reviewed.
In every building review we look at the heat demand profile of recent years: the highest capacity actually drawn and how often. If it is clearly below the contracted figure, the building is paying for something it does not use. A reduction is agreed with the supplier on the basis of heat meter readings and BMS trends from several heating seasons.
Questions and answers
What is contracted capacity?
The maximum heat output the supplier commits to deliver. Its charge is fixed and does not depend on consumption.
How do we know it is too high?
From the heat demand profile of recent years. If peak demand is clearly below the contracted capacity, it is worth reviewing.