What does full air handling unit control add over simple BMS integration?
Paweł Skowron, lead automation engineer, IQ-BuildingUpdated:
Integration lets the BMS read and change what the factory controller exposes. Full control – our own controller and program – gives access to everything: we can add pressure transmitters on the filters and energy meters on the fans, and then change filters by actual loading rather than by the calendar. In both cases ventilation should follow how many people are actually in the building, not just the clock.
What the BMS shows
Depending on how a unit is equipped, we monitor air temperatures, humidity and humidifier status, damper positions and recirculation rate, rotary heat exchanger speed, heating and cooling coil parameters, fan speeds, duct pressure and airflow, CO₂ concentration, filter pressure drop and fan energy. Every parameter has a trend, and the unit is shown as a 3D model matching its real configuration.
Control by demand, not only by the clock
A schedule is the starting point: the unit has separate settings for occupied hours and for the rest of the time, and can be switched off entirely at weekends. A schedule alone does not know how many people are in the building, so we add control based on measurements. CO₂ sensors on the floors show how much fresh air is really needed: when the concentration passes set thresholds, for example 800 and 1,200 ppm, the BMS raises the unit’s output by a set amount, for example 10% and 20%. In zones with VAV terminals, airflow follows the CO₂ reading zone by zone, as described in our article on VAV control strategies. Supply temperature can be fixed or follow curves based on outdoor temperature, separate for summer and winter.
Integration versus full control
With integration the BMS talks to the factory controller and can do only what it allows. We often deliver the complete controls instead: our own cabinet, controller and program. We then decide what is measured and how the unit is controlled.
Filters changed by loading
We fit differential pressure transmitters across the filters. A simple pressure switch only says “filter dirty”; a transmitter measures the pressure drop continuously, so the rate of loading is visible. That rate changes through the year: in the smog season or during heavy pollen, filters clog much faster. In other months a fixed two-month interval makes no sense and a filter can stay in for three. Every change costs filters and labour. A unit typically has two filter stages on the supply side (G4 pre-filter and F7 fine filter) and a G4 filter on the extract side; as a rough guide, a full set for one medium-sized unit costs PLN 1,000–2,000, so one change across a building with ten units is PLN 10,000–20,000 in filters alone.
Energy meters on the fans
- Constant static pressure control: the pressure stays the same, but as filters load the fan has to work harder to hold it. Energy use rises.
- Constant speed control: the fan runs the same, but less air passes through a loaded filter. The transmitters show a rising pressure drop across the filter and falling duct pressure.
In the first case a dirty filter costs electricity, in the second it costs airflow. Either way the data shows it before anyone notices.
Questions and answers
How often should filters be changed?
Ideally by the measured pressure drop across the filter. Loading depends on season and air quality, so a fixed interval is sometimes too short and sometimes too long.